Exploration of existing engineering systems. Development of solutions to reduce energy consumption. Design work. Author’s supervision of the project implementation
LOCATION: Kharkiv
AREA: 130 m2
YEAR: 2017
Replacement of the gas boiler with a geothermal heat pump for heating and hot water supply of the house allowed to reduce operating costs.
A weather-dependent temperature schedule for the heating system allowed the supply temperature to the underfloor heating and radiators to be lowered and provided additional savings.